Tesco Superstore, Fakenham

As part of their maintenance programme, our client had significant areas of their car park that required machine patching and white lining. This project had to be completed during a single Sunday evening to ensure minimal disruption to trading hours and to the public.

Project Key Stats

night

On-site Duration

sq/m

Total Site Area

Project Overview

Services Delivered

Objective

Following a site survey carried out by our dedicated estimating team, NMC Surfacing was instructed to plane out and resurface the areas of the car park that had been identified for repair. The project also required us to re-line these areas.

Delivery

The challenge for NMC Surfacing was to complete the works within the time constraints offered. We worked closely with the store manager throughout the project and were able to secure part of the site earlier than initially anticipated. The only limitation was a request that we down tools during a remembrance service at a local memorial. We were, of course, happy to oblige and received a visit from a member of the church who thanked us personally for demonstrating respect.

We used a 1 metre tracked planer to excavate the surface which we replaced with a 10mm SMA Material.

The project was completed on time and we were awarded a 10/10 overall score from the store.