ESSO WASHINGTON

Our client contacted NMC to provide a number of maintenance repairs to their Petrol Forecourt sites across the UK. Following a site survey by NMC recommendations were passed to the client tailored to meet their needs.

Project Overview

Services Delivered

Objective

Our client contacted NMC to provide a number of maintenance repairs to their Petrol Forecourt sites across the UK. Following a site survey by NMC recommendations were passed to the client tailored to meet their needs.

Following a site survey by NMC, a defective photo survey and locations plan was presented back to our client, this report highlights areas of surface failings based on the current site conditions. NMC was tasked with surfacing areas around the forecourt at this Esso site in Washington.

A site closure was required to complete the works safely so planning and efficiency was key to have the petrol station back open as soon as possible.

Delivery

A traffic and pedestrian management DWG was provided by NMC for the eight hour closure of the site.
The areas were planed and swept before relaying the SMA10 surface course, compacting and sealing all joints with hot bitumen.

The works were safely completed in a single day and resulted in an extremely pleased client.

“I’m happy with the work, they did a great job”
Mr Karunakaran – Duty Store Manager

Project Gallery

Quick Contact

Ready for a Site Survey?

Contact us today on 0800 230 0215