the co-operative, york

Our client required urgent car park repairs due to severe failings down to age. NMC Surfacing were requested to complete the repairs to the car park situated next to the busy store. Due to the severity of the damage to the surface course and binder course, the area required planing to a depth of 100mm before resurfacing.

Project Key Stats

days

On-site Duration

930 sq/m

Total Site Area

21

Parking Spaces

Project Overview

Objective

As retail specialists, NMC Surfacing was awarded this project at The Co-operative store in York, our reputation, and experience within the retail sector to deliver the works made NMC the perfect partner. The car park, which was to be closed during the works, was in dire need of repair. The store also experienced flooding issues and requested our drainage division investigate. Large potholes and surface course failure resulted in a complete car park resurfacing project, with substantial damage throughout the car park, the area required planing to a depth of 100mm.

Delivery

We began this project with our drainage division conducting a CCTV drainage survey to investigate the cause of the flooding. The results thankfully showed the problem was due to a build-up of debris in the drainage system which was easily removed using a jet vac.

Our surfacing team was then tasked with resurfacing the 930m² car park area, planing to a depth of 100mm to remove the damaged surface layers and ensuring the car park was level for resurfacing, the team then replaced the binder and surface course over two days.

The area was completed with line marking as to the current layout, with a total of 21 car park spaces for customers including disabled and parent and child bays.

Project Gallery

Ready for a Site Survey?

Contact us today on 0800 230 0215