Case Studies

View our case studies below to see examples of projects we have worked on.

Euro Garages, Gateway1000 Service Station

As a petrochemical and retail specialist NMC was awarded a surfacing and road marking project at a new build petroleum forecourt and service area situated at Gateway1000, Arlington Business Park in Stevenage.

Read full case study.

Two Rivers Shopping Centre, Staines

As surfacing specialists in the retail environment, NMC was approached by our client, one of the UK’s biggest property management companies, to complete construction, maintenance and repair works at the Two Rivers Shopping Centre in Staines. A busy car park that is open 24 hours a day, seven days a week reaching an average of 4,000 customers a day. The works incorporated surfacing, line marking, drainage and a large civils element in the redevelopment of the entrance to the south and west car park, creating a new roundabout and entrance resulting in additional parking space and the re-positioning of an iconic statue. The resurfacing works covered the complete 26,000m² car park, delivery road and entranceways.

Read full case study.

McArthurGlen Ashford Designer Outlet

Following recent work with our client at their site in York, McArthurGlen approached NMC to complete a large-scale resurfacing and civil engineering project at their site in Ashford Kent.Ashford Designer Outlet is an architectural spectacle, with the large 24,000m² car park in the centre of the egg-shaped structure offering 1090 parking spaces. Designer stores line the exterior and include names such as Nike, Boss, Radley and Ralph Lauren.

Read full case study.

Shell Easington Services

Our client procured the services of petrochem specialists NMC to carry out major ashphalt repair works to the existing and highly deteriorated HGV parking area of the service station at Easington East. The service station itself is situated on the highlt trafficked A19 south of Newcastle-Upon-Tyme.

Read full case study.

Grand National Retail Park

NMC was approached by the Property Agent for Grand National Retail Park to resurface the 2,687M² car park and service road at the site in Aintree. The site was home to other stakeholders including Pure Gym, Toby Carvery, KFC, Aintree International Equestrian Centre and a Premier Inn.

Read full case study.

Walthamstow Service, London

NMC have completed works at Walthamstow services situated on the A406 North Circular in London. Following a site survey the project was awarded to NMC that included over 550m² resurfacing, concrete repairs to eight areas of the forecourt area, the installation of new F900 Fibrelite inspection covers and thermoplastic marking.

Read full case study.

The NEC, Birmingham

Our client approached NMC to restore a dilapidated coach parking area at the NEC in Birmingham. Following a recent meeting at a supplier day our client awarded NMC this project because of our experience and capabilities particular with surfacing and drainage.

Read full case study.

ASDA Wigan

NMC were awarded the contract for a complete resurfacing project at ASDA Wigan. The site entailed over 18,000m² of resurfacing using 1,300 tonnes of material with a full relining scheme, signs, and installation of bollards and landscaping.

Read full case study.

Highfield Park Trust

Following some recent funding to the trust that was established in 1996, the client contacted NMC to assist in the redevelopment of their deteriorating footpaths. This enquiry came following a recommendation to the trust by a previous park and recreational project completed by an NMC Project Manager. With a site visit by NMC we were able to advise on some cost saving measures that enabled the client to extend the area of resurfacing in their initial plans.

Read full case study.

Premier Inn  Luton

NMC were asked by Premier Inn to restore a number of their sites particularly in the south. Premier Inn Luton situated one mile from Luton Airport was in desperate need of restoration. Large pot holes and surface de-lamination had occurred at the entrance to the hotel and restaurant causing potential tripping hazards and a greater possibility of damage to vehicles.

Read full case study.

Esso Washington

Our client contacted NMC to provide a number of maintenance repairs to their Petrol Forecourt sites across the UK. Following a site survey by NMC recommendations were passed to the client tailored to meet their needs for the Esso site in Washington

Read full case study.

BT Fleet

BT approached NMC to provide a number of maintenance repairs to their sites across the UK. Large areas of the parking and walkways at BT Fleet were at the end of their life-cycle and posed a significant risk due to dangerous potholes and uneven surfaces.

Read full case study.

Tesco Thurso

Tesco called upon NMC outside of our framework area to resurface their car park at Thurso, on the north coast of Scotland. The project required 4,600m² of car park resurfacing and 55l/m of ACO channel replacement.

Read full case study.

Tesco Inverness

Tesco called upon NMC to resurface their car park at Inverness. The project required 4,208m² of car park resurfacing a new speed hump at the store entrance and full ACO channel replacement.

Read full case study.

Two Rivers – Drainage

NMC was approached by our client at Two Rivers Shopping Centre in Staines to complete a full maintenance package of their entire car park, this included the drainage element. CCTV surveying the 250m of drainage and repairing damaged drains with no dig technology.

Read full case study.

Tesco Castle Douglas

As a framework supplier to supermarket giant Tesco, NMC was tasked with the resurfacing project at Castle Douglas in Dumfries. The project required 4,022m² of car park resurfacing and resetting an additional 200m² of block paving.

Read full case study.

Shell Tankersley

Petrochem specialist NMC were asked to carry out concrete repairs and resurfacing works on a Shell Petroleum Forecourt and McDonalds Restaurant service area in Tankersley, Barnsley. Following a site visit by NMC to evaluate the repairs the decision was made by our client to replace the 1,550m² area.

Read full case study.

BP Bullionfield

With the popularity of this petrol station and the amount of traffic this forecourt sees in a single day, the surface course leading to and from the forecourt and the HGV lane was in dire need of repair. Large pot holes and surface cracking were visible and would eventually lead to site health and safety issues if not corrected.

Read full case study.

The Co-operative, York

Our client required urgent car park repairs due to severe failings down to age. NMC Surfacing were requested to complete the repairs to the car park situated next to the busy store. Due to the severity of the damage to the surface course and binder course, the area required planing to a depth of 100mm before resurfacing.

Read full case study.

Nene Valley Retail Park, Northampton

Our client, one of the worlds leading property agents, had a busy retail park which required car park restoration due to failings down to age. The car park required resurfacing with minimal disruption to both the retailers and the public as the site would remain open during the work.

Read full case study.

Clifton Moor, York

Our client had a busy retail park which required car park restoration due to failings down to age. The complete car park needed to be resurfaced with minimal disruption to both the retailers and the public as the site would remain open during the work.

Read full case study.

ABP Greasley Way, Immingham

A business located next to the road was suffering from water damage due to the condition of the road and the volume of HGVs using it during flooded periods. Our client wanted to correct the problem and prevent further disruption for the business owner.

Read full case study.

Argos, Bridgewater

The client required a full internal and external relining and demarcation programme to be carried out at their distribution centre. NMC Surfacing was invited to survey the site and submit a tender for the works

Read full case study.

Asda, Hatfield

Our client required a full refurbishment of their car park, including surfacing, civils, and landscaping works. This project had to be carried out during the day due to EA restrictions. The store is a live site situated in a busy town centre; minimal disruption to the local community and trading hours was essential.

Read full case study.

Asda, Wembley

Following a serious health and safety incident the client had been advised that they should review the visibility within their car park.

Read full case study.

Bentley Bridge Retail Park, Wolverhampton

NMC Surfacing were appointed as contractor for an out of hours asphalt resurfacing and line marking project on a multi-let retail park.

Read full case study.

BP, Kettering

The client initially employed us to carry out some minor asphalt repair works in the HGV fuel filling area of the service station. Prior to commencing these works our highly-experienced surveyors visited the site and identified further areas that required urgent attention due to subsided, defective, and failed surfacing.

Read full case study.

Gallagher Retail Park, Cheltenham

New coloured walkway marking system for car parks, designed and developed by NMC Surfacing.

Read full case study.

Harvey Centre, Harlow

Our client required a full repair to be carried out on the upper deck of their multi-storey car park in a busy town centre shopping mall. The client wanted to use the repair as an opportunity to increase parking bays where possible.

Read full case study.

Ikea, Lakeside

Our client had identified surface failures in the pick-up/collection area of the car park at their busy store. These failures extended onto the main access road and were creating potential health and safety issues.

Read full case study.

McArthur Glen, York

Our Client had a busy Designer Outlet with significant areas of car park that were failing due to age, these areas needed to be resurfaced with minimal disruption to both the retailers and the public.

Read full case study.

McVities, Manchester

Our client had several large areas of concrete carriageway that had fallen into disrepair. Repairs were to be carried out with minimal disruption to prevent any interruption of production.

Read full case study.

M&S, London

As a leading nationwide surfacing and civil engineering specialist for the retail sector, NMC was appointed by Marks + Spencer to carry out a full car park refurbishment project.

Read full case study.

Rapleys Letchworth

The client had several sites that had fallen into varying stages of disrepair. Most sites were unrelated and in different locations across the town.

Read full case study.

Riverside Retail Park, Norwich

The client had identified areas of the car park that had fallen into disrepair. The car park belonged to a busy Retail Park and consideration needed to be given to the effect any disruption may have on trade.

Read full case study.

shell Ockbrook, Derby

NMC was contacted by their client on behalf of shell, and were requested to attend site with their engineers to ascertain and report on a suspected water leak following receipt of high water bill.

Read full case study.

Tesco Superstore, Fakenham

As part of their maintenance programme, our client had significant areas of their car park that required machine patching and white lining. This project had to be completed during a single Sunday evening to ensure minimal disruption to trading hours and to the public.

Read full case study.

Twickenham Stadium, Twickenham

This resurfacing project was a game of two halves, carrying out resurfacing and re-laying block paving around the busy events schedule.

Read full case study.

Yorkshire Wildlife Park, Doncaster

Our client, one of the regions leading tourist attractions, needed 12,500m2 of outdoor footpath’s surfaced dressed to make the park more accessible and allow for future expansion.

Read full case study.