Case Studies

View our case studies below to see examples of projects we have worked on.

ABP Greasley Way, Immingham

A business located next to the road was suffering from water damage due to the condition of the road and the volume of HGVs using it during flooded periods. Our client wanted to correct the problem and prevent further disruption for the business owner.

Read full case study.

Argos, Bridgewater

The client required a full internal and external relining and demarcation programme to be carried out at their distribution centre. NMC Surfacing was invited to survey the site and submit a tender for the works

Read full case study.

Asda, Hatfield

Our client required a full refurbishment of their car park, including surfacing, civils, and landscaping works. This project had to be carried out during the day due to EA restrictions. The store is a live site situated in a busy town centre; minimal disruption to the local community and trading hours was essential.

Read full case study.

Asda, Wembley

Following a serious health and safety incident the client had been advised that they should review the visibility within their car park.

Read full case study.

Bentley Bridge Retail Park, Wolverhampton

NMC Surfacing were appointed as contractor for an out of hours asphalt resurfacing and line marking project on a multi-let retail park.

Read full case study.

BP, Kettering

The client initially employed us to carry out some minor asphalt repair works in the HGV fuel filling area of the service station. Prior to commencing these works our highly-experienced surveyors visited the site and identified further areas that required urgent attention due to subsided, defective, and failed surfacing.

Read full case study.

Gallagher Retail Park, Cheltenham

New coloured walkway marking system for car parks, designed and developed by NMC Surfacing.

Read full case study.

Harvey Centre, Harlow

Our client required a full repair to be carried out on the upper deck of their multi-storey car park in a busy town centre shopping mall. The client wanted to use the repair as an opportunity to increase parking bays where possible.

Read full case study.

Ikea, Lakeside

Our client had identified surface failures in the pick-up/collection area of the car park at their busy store. These failures extended onto the main access road and were creating potential health and safety issues.

Read full case study.

McArthur Glen, York

Our Client had a busy Designer Outlet with significant areas of car park that were failing due to age, these areas needed to be resurfaced with minimal disruption to both the retailers and the public.

Read full case study.

McVities, Manchester

Our client had several large areas of concrete carriageway that had fallen into disrepair. Repairs were to be carried out with minimal disruption to prevent any interruption of production.

Read full case study.

M&S, London

As a leading nationwide surfacing and civil engineering specialist for the retail sector, NMC was appointed by Marks + Spencer to carry out a full car park refurbishment project.

Read full case study.

Rapleys Letchworth

The client had several sites that had fallen into varying stages of disrepair. Most sites were unrelated and in different locations across the town.

Read full case study.

Riverside Retail Park, Norwich

The client had identified areas of the car park that had fallen into disrepair. The car park belonged to a busy Retail Park and consideration needed to be given to the effect any disruption may have on trade.

Read full case study.

Shell Ockbrook, Derby

NMC was contacted by their client on behalf of Shell, and were requested to attend site with their engineers to ascertain and report on a suspected water leak following receipt of high water bill.

Read full case study.

Tesco Superstore, Fakenham

As part of their maintenance programme, our client had significant areas of their car park that required machine patching and white lining. This project had to be completed during a single Sunday evening to ensure minimal disruption to trading hours and to the public.

Read full case study.

Twickenham Stadium, Twickenham

This resurfacing project was a game of two halves, carrying out resurfacing and re-laying block paving around the busy events schedule.

Read full case study.

Yorkshire Wildlife Park, Doncaster

Our client, one of the regions leading tourist attractions, needed 12,500m2 of outdoor footpath’s surfaced dressed to make the park more accessible and allow for future expansion.

Read full case study.